Savings Calculator

Estimate concrete, weight and CO₂ savings of the voided slab system for your project.

1530 cm60
100 – 100.000 m²
90
Concrete saved · m³
216
Dead load reduction · ton
36.0
CO₂ saved · ton
≈%33
Overall savings

Estimate based on ≈30% void ratio. Contact our engineers for a project-specific feasibility report.

Get a Project-Specific Quote